The guys have been working furiously, and have made a lot of progress. We really are so thankful that they have been able to get so many things fixed in just a few weeks.
DONE - The windex and lightning deflector have been added to the top of the mast
DONE - The freezer is now fixed (so both fridge and freezer are operational)
DONE - The DVD player and stereo have been replaced
DONE - Masthead foredeck lights are working
DONE - The bow thruster has been fixed
DONE - The air conditioning in the aft cabin is working (yeah!)
DONE - Water maker is all fixed
DONE - LED lights on the bilge pump and windlass are working
These are the things that are still on the "to do" list.
Work in progress - LED lights on the main control panel
Work in progress - Single Side Band radio
Work in progress - VHF
Work in progress - Radar
Work in progress - AIS system
Work in progress - Tacometer / engine instruments
Work in progress - tank indicators
Slowly but surely!
No comments:
Post a Comment